IBDAA AL-EAJCONTRACTING

King Abdullah International Gardens

Phase 3 — Riyadh2024 – 2026

Project data

Owner
Ministry of Municipal and Rural Affairs — Riyadh Municipality
Consultant
Dar Al-Handasah (Shair and Partners)
Main contractor
Zaid AlHussain & Brothers Group
Period
04/2024 – 09/2026
Contracts
Two contracts, 14 amendments and the shade works
Contract type
Unit and piece rates

What we built at the Gardens

Scope of workDetail
Reinforced slabs on grade (SOG) with ACO drainage channelsSC 476
Mass concreteSC 476
Souk area worksSC 555
Concrete encasementSC 621
Foundations and walls of electrical substation rooms, and manholesSC 1017
Footings, grade beams, slabs and open channelsSC 1102
Coloured plaster for the towersSC 526 · 1071
BlockworkSC 1119
Shade footings and column necks, and the shades slab22/09/2026

From site

Circular structures — Under the dome
Fountain rings — Before pouring
Circular structure — After waterproofing
Under the domes — Pumps and mixers
Tower — Plastering
Cylindrical reinforcement — King Abdullah Gardens
Walls under the dome — Formwork
Reinforcement — Fountain rings before pouring

Get in touch

Send us your drawings and bills of quantities, and we will come back to you with a quotation.

Request a quotation