Quality control
What we check, when, and who approves
| Item | What we check | When | Who approves |
|---|---|---|---|
| Excavation | Level, bottom grading and preparation | Before blinding | Consultant's engineer |
| Waterproofing | Overlaps, bonding, corners and joints | Before backfilling or rebar | Consultant's engineer |
| Formwork | Dimensions, alignment, fixing and clean surfaces | Before pouring | Consultant and main contractor |
| Reinforcing steel | Diameters, spacing, cover and laps | Before pouring | Consultant and main contractor |
| Concrete | Mix conformity, samples and curing after pouring | During and after pouring | Main contractor and laboratory |
| Plaster and blockwork | Flatness, corners and alignment | Before final finishing | Consultant's engineer |
Execution stages and hold points
Site takeover
Hold pointMethod statement approvalExcavation and blinding
Hold pointBottom level acceptanceWaterproofing
Hold pointWaterproofing inspectionFormwork and rebar
Hold pointConsultant acceptance before pouringPouring and curing
Hold pointConcrete samples during pouringStriking and handover
Hold pointFinal acceptance

Planning and follow-up
| Document | When | Purpose |
|---|---|---|
| Work plan | Weekly | Work fronts, crews and planned pours, coordinated with the main contractor's schedule |
| Method statement | Before each item starts | For consultant approval before execution |
| Inspection request | Before every pour or cover-up | Acceptance of rebar, formwork and waterproofing by the consultant's engineer |
| Daily report | Daily | Manpower, executed quantities and any obstacles |
| Quantity survey | Monthly | Executed and approved quantities, the basis for the payment certificate |
| Comments log | Ongoing | Tracking the consultant's comments until closed |
| Handover record | At handover | Handing over completed works to the main contractor |